Generating a status report |
![]() ![]() ![]() |
If this is done through the main screen of the Project tracking menu, first, locate and select the desired project from the list of records. After that, click on More
On the screen that will be displayed, enter an ID # and a name for the status report.
GeneralOn this tab, the Period, Status, Base date, Project and Responsible fields are filled out with their project information and status report being created. Fill in the following fields:
Use the
If the OK: At this point, the system will display the status report screen to be filled out. See more details about this operation in the Editing a status report section. Cancel: The screen will close. If the report is being generated by the main screen of the Tracking menu, to edit the data of the report it is necessary to access the project data screen in the Record data |