▪For the execution of the control test, customize the evaluation criteria: When enabled, it allows customizing the audit evaluation criteria in the execution of the risk and control plan control test. ▪Audit evaluation criterion column: Define the criterion to be applied to each object type in the audit. ▪Default conformity level column: Enter the reference conformity level for that object type, if any. ▪Audit test configuration: Select the Configuration to be applied to the audit test. ▪Allow manually changing the conformity level of the upper items by replacing the automatic calculation: Allows the conformity level and its value to be manually edited during the audit execution. This option should be enabled when the automatic generation of the result is not configured in the conformity level of the evaluation criterion.
Save the record to apply the changed configurations.
|