Navigation:  My tasks > Execution >

Goal plan draft

Previous  Top  Next

Task:

Goal plan draft

Who receives it:

Users set as members of the team responsible for the goal plan.

When:

After the goal plan is planned;

A draft route is configured in the goal plan.

Purpose:

To allow drafting the planned goal plan.

 

How to execute this task:

 

1.

In the list of pending records, find and select the desired goal plan.

 

2.1_auxnmb

1_auxnmbAfter that, click on the default button on the toolbar.

 

3.

At this point, the goal plan execution data screen will open with the previously planned information. For detailed information about the screen fields, access the Adding a goal plan cycle section.

 

4.

Access the "Goal" section and draft the goals included in the planning of the plan. To do so, just edit the desired goal through the list shown in the section.

 

5.

After configuring what you want, save the goal plan.