Activity scheduling |
Location: Management Activity scheduling
Prerequisites:
Overview: Through this menu, it is possible to control the activities that are scheduled for a given period. This scheduling allows the manager to have greater visibility of the work plan for a determined period, enabling the due adjustments to be made to balance the use of resources. Example: A certain piece of equipment has a preventive maintenance frequency configured to occur every month. Then, the system allows configuring a scheduling to create the activities referring to the preventive maintenances of a given period automatically. Using the example, for a scheduling period of one year, the system will create automatic activities to occur every 30 days. Thus, instead of generating preventive maintenance tasks every month, the system will automatically generate the records for the entire period configured in the scheduling. The main screen is divided into three quadrants. The first quadrant displays the panel with search filters that allow locating the plans and their maintenance activities more easily. The second quadrant displays the maintenance plans created in the system, while the third quadrant displays the scheduled activities of the plan selected in the second quadrant.
Specific buttons:
|