A determined process accepts the uncertainty, that is, the error of 15 kilograms (Upper tolerance + Lower tolerance). However, it will not be possible to leave the asset with the acceptable error of 15 kilograms, because, over time, it may be damaged and increase weight and, consequently, exceed the tolerance. For that, the system will use a reducer to decrease the tolerance accepted in the asset that, in the example, is 3 kilograms.
Process tolerance =
|
15
|
reducer =
|
03
|
Then the asset may have an uncertainty of up to 5 kilograms (15/3).
|