Click on this button to associate a cost type with the maintenance plan. In the respective field on the screen that will be opened, select the desired type. The types available for selection are those recorded in SE Asset. Use the other buttons next to the field to add a cost type and associate it with the maintenance activity and clear the field.
In the Estimated cost field, enter the estimated value of the extra cost. This field can be filled out by the default value of the selected type (if any), and it is possible to edit it.
Check the Required field to require filing out the value of the selected type when executing the activities based on the template. Keep the option unchecked if filling out the cost is not mandatory.
Once done, click on Save.
|