Overview:

When accessing this menu, the system will display a screen in which, through the calendar area, it is possible to track the meetings, nonproject (SE Time Control) or project (SE Project) tasks, monitored events (SE Time Control), planned or isolated actions (SE Action plan), verification activities (SE Asset), calibration activities (SE Calibration) and preventive and corrective maintenances (SE Maintenance) which the resources added to the system are allocated to or responsible for.

 

Specific buttons:

Refer to the Scheduling wizard arrowrgray Toolbar section for a detailed description of the buttons displayed on the screen. Note that the options in the "Actions" and "Edit" palettes will not be available to be used through this menu.

 

Use the filters described below to locate the desired records through specific information. To use these filters, go to the Search filters panel and click on the addfilter button to add filters.

 

For further details about the "Search panel" and other view operations, refer to the "User guide arrowrgrayy Views" section.

 

hmtoggle_arrow1General
hmtoggle_arrow1Components
hmtoggle_arrow1Activity
hmtoggle_arrow1Object
hmtoggle_arrow1Department
hmtoggle_arrow1Position
hmtoggle_arrow1Resource list
hmtoggle_arrow1Resource
hmtoggle_arrow1Competence
hmtoggle_arrow1Functional role
hmtoggle_arrow1Resource attributes

 

After you complete the necessary filters, click on the SEARCH button on the Search filters panel or press ENTER on the keyboard to perform the search. The result will be listed in the calendar in the right side of the screen.