Navigation:  »No topics above this level«

Scheduling configuration

Top  Top 

In SE SPC, it is possible to schedule the creation of recurrent action plans. To do that, access the Configuration Scheduling menu and click on the button located on the main screen toolbar.

 

On the screen that will be opened, enter an ID # and a name for the scheduling. To enter an ID # more easily, the button next to the field can be used to generate a new sequential number. Fill out also the required fields in the following tabs:

 

 

Note: To successfully create a scheduling, fill out the required fields in the General tab. After saving the record, the other tabs will be enabled for completion.

 

General

Template

History