Navigation:  Execution > Calibration execution >

Timesheet (SE Time Control)

Previous  Top  Next

When the integration with SE Time Control is not configured, the technician timesheet must be entered using the Technician allocation feature. To do that, in the data screen of the calibration activity (in progress), go to the "Resources Technician" section, select the desired technician and click on the button. The following screen will be displayed:

 

 

(A)

Corresponds to the scheduled period for the execution of the activity, in the calibration planning step. It is worth remembering that it will not be possible to enter the time in this period.

(B)

Corresponds to the period of execution of the calibration activity. In this period, it will be possible to create the timesheet since it corresponds to the days in which the activity was in execution. The period is formed by the start date (C) of the calibration execution until the current date (D).

(C)

Execution start date of the calibration activity. This date is entered in the General data of the calibration activity.

(D)

Current date (today). Remember that it is not possible to enter time to dates after the current date.