Executing a project APQP/PPAP activity |
The execution of a project APQP/PPAP activity can be performed in the same way as an APQP/PPAP activity, as described in the Executing an APQP/PPAP activity section. However, when it is a Project APQP/PPAP task, it can also be performed by SE Project.
As soon as the project is sent to the execution step, the APQP/PPAP will also be sent to execution. This means that the project tasks will be presented both in SE APQP/PPAP, through the "APQP/PPAP activity execution" task, as well in SE Project, through the "Task execution" task.
This section will describe how to perform a project APQP/PPAP task through SE Project:
First, in SE Project, access the "Task execution" task, or access the "Execution Task execution" menu. Locate the desired project tasks and click on the button, by selecting the Task data. At this point, the project task data screen will be displayed.
In order to perform the project task execution with SE APQP integration, two things must be done: the execution dates (A) and the APQP/PPAP form (B) must be filled in.
Once all the required task information has been filled, save the project task data.
|