Navigation:  Execution > Activity execution >

Finishing the maintenance activity

Previous  Top  Next

See how to end the maintenance activity:

 

1.1_auxnmbTo finish a maintenance activity, first locate the maintenance that is with the "Execution" status, which can be found by the play icon in the S column.

 

Use the Search filters, located on the left side of the main screen, to find the desired maintenance more easily.

 

2.After that, click on the edit button to open the maintenance data in edit mode.

 

3.In the General data arrowrgray General data section, fill in the fields related to the maintenance execution:

 

dados_manutencao_encerrar_zoom75

 

Execution: Enter the data related to the end of the maintenance activity execution:

End: Enter the end date of the maintenance. This field may be automatically filled in if the Actual % field has been filled in with 100%.

Time: Enter the end time of the maintenance.

Duration: This field is filled out by the system with the number of hours the activity was running.

Actual %: As soon as the end date is filled in, this field if filled in with 100%. If this field is filled with 100%, the activity execution will be finished, that is, the End date will be filled with the current date.

 

4.After completing all necessary maintenance execution information, click on the button in the Execution section to send the execution to the next step. The system will ask whether you wish to send the record to the next step.

Operation

 

Confirm

The record may move on to one of the following steps:

Execution approval: The record will continue to this task if the standard activity associated with the maintenance plan is configured with the execution approval step.

Finished: If the approval step is not configured in the activity, then the maintenance will be finished.

Cancel

The activity will remain in the current step.

This activity may also be executed later by clicking on the next button, located in the third quadrant on the main screen, or through the Activity execution task.

 

It is worth remembering that if the integration with SE Storeroom is configured in the SE Asset general parameters, there may be output events that are automatically closed with the activity.