Configuring an area chart |
To configure an area chart, access the Configuration Area chart menu. After that, the following screen will be opened:
On the left side of the screen, select the FMEA type (Design, Process, Asset, Project schedule, Object) to configure the area chart: On the right side of the screen, specify the severity criteria and the failure occurrence:
Save the record after setting the fields above. |