Location: Configuration Priority Evaluation method
Prerequisites:
▪Criterion
Overview:
Through this menu, create all the methods that can be used to determine the priority of the verification activities included in the system. The methods created here will be associated, later, with the standard activities.
Specific buttons:
|
Click on the arrow located next to this button and select the desired option:
▪Add: Allows adding a new evaluation method. See more details on how to perform this operation in the Configuring the evaluation method section. ▪Add new revision: Allows performing a new revision on the evaluation method selected in the list of records. This button is only available if the status of the evaluation method is Released. See more details on how to perform this operation in the Revising an evaluation method section. |
|
Click on this button to edit the evaluation method selected in the list of records.
|
|
Click on this button to delete the evaluation method selected in the list of records.
|
|
Click on this button to release the ongoing revision of the evaluation method that is selected in the list of records.
|
|
Click on the arrow next to this button to export the list of records displayed on the main screen to an Excel file, configure a new report or associate an existing report, or search the parameters that may be used to configure new reports.
|
|
Click on this button to enable/disable the record selected on the main screen. To view the disabled records, use the "Status" field of the General filter in the search filters panel.
|
|
Click on this button to copy the evaluation method selected in the list of records. The start of the performed copy ID # will be "Copy of", facilitating the identification.
|
Use the "Search filters" to easily retrieve records based on specific information.
|
|