Creating a calibration activity (programming)

Previous  Top  Next

See, in this section, how to program calibrations in the system:

 

On the list of records in the second quadrant, find and select the desired calibration plan. Click on the button, located in the third quadrant, to program a calibration activity. If the selected plan has scheduled calibration activities, the system will ask whether you wish to edit the calibration activity data for it to be possible to edit its execution scheduling.

 

At this point, the following data screen will be displayed:

 

 

General data

Certificate: Enter an ID # for the calibration activity. Remember that, if the plan standard activity was configured to use a mask, when generating the automatic identifier, the respective mask will be displayed. This field may be disabled if the respective configuration is also set in the calibration plan standard activity.

Planning: Use this field to enter the planning data for the calibration activity:

Start: Enter the start date and time of the calibration programming. This field is filled in with the current date and time; however, it is possible to edit them.

End: Enter the end date and time of the calibration programming. The Duration field will be calculated automatically by the system.

Execution: The execution fields can only be filled when the activity is in the "Execution" step. However, it will be possible to change the Responsible team for the calibration execution. To define a specific executor, enable this option by clicking on the button next to the Executor field and then select the user who will execute the calibration.

 

After you have completed all required fields, the calibration activity data can be saved for the first time. To do that, click on the Save button to save the data.

 

The details on how to fill/edit the other fields of the calibration activity being programmed can be found in the Editing calibration activity data section.