Overview:

 

By means of this menu, it is possible to execute the control tests of the control analyses. This operation may also be performed through the Control test execution task. The main screen of this menu may be displayed in three quadrants. In the first quadrant are presented the search filters, which allow you to find the desired tests more easily. The second quadrant displays the tests recorded in the system, while the third quadrant displays the details of the test selected in the second quadrant.

 

Specific buttons:

Click on this button to execute the test plan selected in the list of records. See more details on how to execute a test plan in the Executing control tests section.

Click on the arrow next to this button to export the list of records displayed on the main screen to an Excel file, configure a new report or associate an existing report, or search the parameters that may be used in the configuration of new reports.

Click on this button to change the main screen layout to three quadrants. In that case, in the third quadrant, the details of the last control test executed from the record selected in the list of records are displayed.

Click on the arrow next to the button to change the screen layout to 2 quadrants.

 

The control tests may only be executed if the risk plan in question has released or current revision status.