Timesheet (Integration without SE Time Control)

Previous  Top  Next

When integration with SE Time Control is not configured, the technician timesheet must be entered using the Technician allocation feature.

 

To do that, on the maintenance activity data screen (in progress), go to the "Resources arrowrgray Technician" section, select the desired technician and click on the edit button. The following screen will be displayed:

 

alocacao_tecnico_execucao_semtc_edit_zoom65

 

(A) Corresponds to the programmed period for the execution of the activity, in the verification planning step. Remember that it will not be possible to enter time in this period.

(B) Corresponds to the execution period of the verification activity. In this period, it will be possible to create the timesheet since it corresponds to the days on which the activity was in execution. The period is formed by the start date (C) of the maintenance execution until the current date (D).

(C) Execution start date of the verification activity. This date is entered in the General data of the verification activity.

(D) Current date (today). Remember that it is not possible to enter time to dates after the current date.