Click on the arrow below this button and select the corresponding option to add a new:
▪Nonproject task: The system will display the creation wizard to add a new nonproject task. Refer to the specific SE Time Control documentation for more details on this operation. ▪Monitored event: The system will open the screen to allocate a monitored event. Refer to the Allocating a monitored event section for a detailed description on how to perform this operation. ▪Meeting: The system will open a screen for the scheduling of a meeting. Refer to the Adding a meeting section for a detailed description on how to perform this operation.. ▪Verification activity: On the screen that will be displayed, select the plan the verification activity will be created from. Notice that the system will only display the verification plans whose associated assets are available. After that, save the record. Refer to the specific documentation of SE Asset for a detailed description of how to fill out the fields on the screen that will be displayed. This option will only be displayed if the integration with SE Time Control is enabled in the general parameters of SE Asset. ▪Calibration activity: On the screen that will be displayed, select the plan the calibration activity will be created from. After that, save the record. Refer to the documentation of SE Calibration for a detailed description of how to fill out the fields on the screen that will be displayed. This option will only be displayed if the integration with SE Time Control is enabled in the general parameters of SE Asset. ▪Corrective maintenance: On the screen that will be displayed, select the standard activity (SE Asset) that the corrective maintenance will be created from. After that, save the record. Refer to the specific documentation of SE Maintenance for a detailed description on how to fill out the fields on the screen that the system will display. This option will only be displayed if the integration with SE Time Control is enabled in the general parameters of SE Asset. ▪Preventive maintenance: On the screen that will be displayed, select the plan the preventive maintenance will be created from. After that, save the record. Refer to the specific documentation of SE Maintenance for a detailed description on how to fill out the fields on the screen that the system will display. This option will only be displayed if the integration with SE Time Control is enabled in the general parameters of SE Asset. ▪Isolated action: Refer to the specific documentation of SE Action Plan for a detailed description on how to fill out the fields on the screen that the system will display. |