Location: Configuration Receiving Inspection flow
Prerequisites:
▪Team
Overview:
Through this menu, all the possible flows (responsible teams and deadlines) of the inspection step of the item are recorded, such as identification, qualification, inspection, and release.
Specific buttons:

|
Click on this button to add a new inspection flow. See further details about this operation in the Configuring an inspection flow section.
|

|
Click on this button to edit an inspection flow selected in the list of records.
|

|
Click on this button to delete an inspection flow selected in the list of records.
|

|
Click on the arrow located beside this button, to export the list of records displayed on the main screen to an Excel file, configure a new report or associate an existing report, or to see the parameters that can be used in the configuration of new reports.
|

|
Click on this button to enable/disable the record selected on the main screen, thus changing its status to active/inactive.
|
|