Navigation:  Configuration > Priority > Evaluation method >

Configuring an evaluation method

Top  Previous  Top  Next

To add a new evaluation method, click on the new button on the main toolbar. To edit the data of a method, select it in the list of records and click on the edit button.

 

When a new evaluation method is created, its status becomes "Revision in progress". Later on, it will be necessary to create a revision for the method you wish to edit. The methods with this status can be identified by the revisao icon in the RS column.

 

On the screen that the system will open, enter an ID # and a name for the evaluation method. The Revision field will be filled out after saving the record for the first time with the method revision number. The following tabs are also available:

 

metodo_avaliacao_dados

 

Note: To successfully add an evaluation method, it is necessary to fill out the required fields in the General tab. After saving the data for the first time, the other tabs will be available to be filled out. The availability of some tabs may vary according to the configurations performed in the "General" tab.

 

hmtoggle_arrow1General
hmtoggle_arrow1Quantitative
hmtoggle_arrow1Result
hmtoggle_arrow1From/to
hmtoggle_arrow1Where used

 

After setting all the necessary configurations, save the record. To approve the ongoing revision of the evaluation method in question, select it in the list of records on the main screen and click on the default button on the toolbar.