Navigation:  Configuration > General parameters >

Control

Previous  Top  Next

Control

Allow editing next execution of the plan

Checked

Unchecked

Calibration2

The date of the next execution can be edited in the plan type.

It will not be possible to edit the date of the next execution of the plan.

Maintenance3

Verification

Maintenance route3

2 - Available only if the SE Calibration component is part of the solutions acquired by your organization.

3 - Available only if the SE Maintenance component is part of the solutions acquired by your organization.

 

Activities associated with plans

Parameter

Checked

Unchecked

Issue an alert whenever an activity is planned for a date after the plan due date

The system will display a message whenever an activity is planned for a date after the due date of the plan.

An alert will not be displayed when the activity is planned for a date after the due date of the plan.

Do not allow to program an activity to a date later than the plan due date

It will not be possible to schedule an activity for a date later than the plan due date.

It will be possible to schedule an activity for a date later than the plan due date.

Allow listing all scheduled activities of the plan in the activity scheduling task menu

In the list of records of the Verification programming, Calibration programming (SE Calibration), and Activity programming (SE Maintenance) tasks, all planned activities of the plan will be displayed, regardless of their sequence or quantity.

In the list of records of the Verification programming, Calibration programming (SE Calibration), and Activity programming (SE Maintenance) tasks, the oldest activity according to the execution sequence will be displayed.

 

Execution date

Parameter

Checked

Unchecked

Allow entering retroactive dates in the execution of tasks

It will be possible to enter dates previous to the planned/current date during activity execution.

It will be possible to enter previous dates during activity execution.

 

Default calendar for plan creations

Field

Filled out

Not filled out

Calendar

Allows defining a specific calendar to be used by default when creating verification, calibration, preventive maintenance, and maintenance route plans.

In this case, select the desired calendar. The calendars available for selection are configured in the SE Administration component. Refer to this component specific documentation for further details about the calendars and their configuration.

The Calendar field will be blank when creating the plan, allowing you to define a specific calendar.

 

Activity ID #

Parameter

Checked

Unchecked

Allow repeating the activity ID # for different external service centers4

Allows the activities to have the same ID # as long as the associated service center is external.

The activity ID # cannot be the same, even for different service centers.

4 - This configuration does not affect activities with an internal service center, that is, it is not possible to repeat the activity ID #.