On the General tab, general information is available about the requirement revalidation. Fill in the following fields:
Current revalidation: The fields described in this section are filled out by the system with the following information:
▪Number: Number of the current revalidation of the requirement. Click on the button located next to this field to view the current revalidation data screen. ▪Date: Date on which the current revalidation of the requirement was executed. ▪Validity date: Date until which current revalidation will be valid. Reference revalidation: The following fields are available for the revalidation that is being created:
▪Number: This field is filled in by the system with a sequential number to identify the revalidation that is being executed. ▪Date: This field is filled in by the system with the current date. If, in the validity configuration, associated with the process type, the Enable revalidation date to be changed option is not checked, it will not be possible to edit it. Otherwise, it will be possible to edit the date, allowing a retroactive revalidation. ▪Validity: This field is filled in by the system with the Default time defined in validity configuration, which is associated with the requirement type that is being revalidated. If the default time has been defined as Fixed, this field cannot be edited. If it is Variable, it is possible to define the time of the desired validity. ▪Validity date: After saving the record for the first time, this field is filled in by the system with the date until which the requirement in question will be valid. Explanation: Enter an explanation for the revalidation of the requirement in question.
|